EFEKTIVITAS TUNNEL BORRING MACHINE (TBM) TIPE EARTH PRESSURE BALANCE (EPB) DALAM PELAKSANAAN PROYEK MRT JAKARTA FASE 2A CP 201 MONAS-HARMNONI
Abstract
Keywords
References
Ayawah, P. E. A., Sebbeh-Newton, S., Azure, J. W. A., Kaba, A. G. A., Anani, A., Bansah, S., & Zabidi, H. (2022). A Review And Case Study
Of Artificial Intelligence And Machine Learning Methods Used For Ground Condition Prediction Ahead Of Tunnel Boring Machines. Tunnelling And Underground Space Technology, 125, 104497. Https://Doi.Org/10.1016/J.Tust.2022.104497
Guo, D., Li, J., Li, X., Li, Z., Li, P., & Chen, Z. (2022). Advance Prediction Of Collapse For TBM Tunneling Using Deep Learning Method. Engineering Geology, 299, 106556. Https://Doi.Org/10.1016/J.Enggeo.2022.106556
Ilmi, N. (2022). Penerapan Metode Konstruksi Industri 4.0 Pada Siklus Proyek Jalan, Jembatan, Dan Terowongan. Seminar Nasional Insinyur Profesional (SNIP), 2(1). Https://Doi.Org/10.23960/Snip.V2i1.49
Montalbán-Domingo, L., Casas-Rico, J., Alarcón, L. F., & Pellicer, E. (2023). Influence Of The Experience Of The Project Manager And The Foreman On Project Management’s Success In The Context Of LPS Implementation. Ain Shams Engineering Journal, 102324. Https://Doi.Org/10.1016/J.Asej.2023.102324
Nanda, M. P., Riswanto, S., & Kurniawati, M. (2023). Metode Paired Comparison Pada Pekerjaan Pondasi Bangunan Gedung Dengan Pendekatan Studi Value Engineering (VE). JMTS: Jurnal Mitra Teknik Sipil, 449–456. Https://Doi.Org/10.24912/Jmts.V6i2.23387
Qiu, W., Ai, X., & Zheng, Y. (2022). First Application Of Mechanized Method Using Earth Pressure Balance TBM With Large Horseshoe-Shaped Cross Section To Loess Mountain Tunnel: A Case Study Of Baicheng Tunnel. Tunnelling And Underground Space Technology, 126, 104547. Https://Doi.Org/10.1016/J.Tust.2022.104547
Ramadhan, M. (2021). Metode Penelitian. Cipta Media Nusanta
S. Buk’hail, R., & Al-Sabah, R. S. (2022). Exploring The Barriers To Implementing The Integrated Project Delivery Method. Journal Of King Saud University - Engineering Sciences. Https://Doi.Org/10.1016/J.Jksues.2022.04.003
Wang, K., Zhang, L., & Fu, X. (2023). Time Series Prediction Of Tunnel Boring Machine (TBM) Performance During Excavation Using Causal Explainable Artificial Intelligence (CX-AI). Automation In Construction, 147, 104730. Https://Doi.Org/10.1016/J.Autcon.2022.104730
DOI: https://doi.org/10.52447/jkts.v8i1.6882
Refbacks
- There are currently no refbacks.
Copyright@ Pusat Penelitian Fakultas Teknik
Universitas 17 Agustus 1945 Jakarta